Related Rates
Core Sentence / 核心句
A related-rates problem uses a constraint to connect the time rates of several changing quantities.
中文理解:多个量都随时间变化,而一个始终成立的关系式迫使这些变化率彼此关联。
Formula / 公式
If:
then:
Problem Routine / 做题顺序
- Define each changing quantity as a function of time.
- Write a constraint true at every moment.
- Differentiate with respect to time.
- Substitute the instant-specific values.
- Solve with correct sign and units.
Watch Out / 易错点
- 先求导,后代入某一时刻的数值。
- decreasing quantity 的 rate 为负。
- 区分 quantity、rate 和单位。
- equation 必须在整个运动过程中成立,不只是某一个瞬间碰巧成立。
Search and Source Mentions / 搜索与出现位置
Mentioned In / 出现位置
- 微积分BC第5次正课 · Related-Rates Routine
- connect quantities, differentiate with respect to time, then substitute the instant
- 微积分BC第4次正课 · Related Rates Preview
- time is the common input and a constraint links dx/dt with dy/dt
- Chapter 6 · Ladder Setup
- and share time as a common input
- Chapter 6 · Ladder Solution
- the fixed ladder length forces and to balance